The Hits Just Keep on Coming

The Hits Just Keep on Coming
Solution Building
The Hits Just Keep on Coming

Jun 11 2024 | 00:05:33

/
Episode 90 June 11, 2024 00:05:33

Hosted By

Mark Eastman

Show Notes

And the Rut Just Keeps Getting Deeper

It’s Sunday afternoon and after getting home from church, Gene is back at his desk (the dining table) working on the third construction bid. He would rather be watching the NASCAR race, but there’s just not enough time for both.

Some people would say that getting three of the four bids done is pretty good. There are a lot of people in construction that wouldn’t sweat this, but it bothers Gene to not follow through on what he said he would do.

It’s getting late and the family has already gone to bed as he starts the next bid.

At 1:15 AM Monday morning, Gene decides to go to bed even though the bid isn’t done yet. He needs to get up in a few hours and do some actual construction work.

View Full Transcript

Episode Transcript

And the Rut Just Keeps Getting Deeper It’s Sunday afternoon and after getting home from church, Gene is back at his desk (the dining table) working on the third construction bid. He would rather be watching the NASCAR race, but there’s just not enough time for both. Some people would say that getting three of the four bids done is pretty good. There are a lot of people in construction that wouldn’t sweat this, but it bothers Gene to not follow through on what he said he would do. It’s getting late and the family has already gone to bed as he starts the next bid. At 1:15 AM Monday morning, Gene decides to go to bed even though the bid isn’t done yet. He needs to get up in a few hours and do some actual construction work. It’s Monday morning and Gene is on his way to one of the two projects that he has going. It’s 7:00 AM and he’s supposed to meet Tony at the first project at 7:30. Tony works for Gene. He’s been working for him now for almost a year. He does good work and knows construction. This allows Gene the flexibility to split up and work on more projects. Gene starts unloading the tools and getting the things ready that Tony’s going to need. This project is setting some new interior doors. It’s 8:00 AM and Tony hasn’t shown up yet…Gene calls him, but there’s no answer. Where is he? This job needs to be done this week. Tony was supposed to pick up the new doors on his way to the job this morning. Gene calls the lumber yard, and they haven’t seen anything of Tony yet. Gene goes to work, removing the first door that’s going to be replaced, as he waits on Tony. Still, no Tony, and Gene has three doors out. He calls the lumber yard and it’s going to be a couple of hours before they will be able to get them delivered. He doesn’t want to take out any more until the new ones are installed in these openings. It looks like Gene needs to go get some doors. Gene heads to the lumber yard to go get the doors. Gene’s hurrying down the highway in route to the lumber yard when he hears a siren. He looks in his mirror and right behind him are flashing red and blue lights. He looks down at the speedometer and wouldn’t you know it….70 in a 55. He pulls over and starts getting his driver’s license and insurance information ready. The Highway Patrol Officer comes up and says, “Do you know why I pulled you over?” “Yes officer, I was in a hurry to get to the lumber yard and get some doors for a job,” Gene replies. The officer takes the license and insurance card back to his car and Gene waits. While he’s waiting, he tries to call Tony again…still no answer. The officer comes back and gives Gene a speeding ticket for $150.00. The day is not getting any better. Gene makes his way to the lumber yard, gets the doors, goes back to the job site, and gets to work setting doors. It’s lunch time, still no Tony and he’s still not answering his phone. He must be sick, Gene thinks. It looks like Gene is going to need to stay and work on this job today. He’s already called the customer of the second job to let them know that he’s not going to make it today. It’s 6:00 PM and Gene got four of the seven doors changed. He’s loading up tools and picking up the job site. He never heard back from Tony, so he’s going to drive by his house on the way home. As Gene pulls up, he sees Tony’s truck in his drive, so he must be home. He goes up and knocks on the door. As the door opens, Tony is standing there and he doesn’t look sick at all. He does look a little guilty though. “So, what happened today?” Gene asks, “You were supposed to work on setting doors today.” Tony looks down at the ground and says, “Ya, I know. I should have called you and let you know I wasn’t going to be there.” “What happened? Why didn’t you show up or at least call me?” Gene asked. “Well,” Tony said, “You know that big construction company that’s doing that big project out on the edge of town? I saw the production manager at the hardware store on Saturday and he offered me a job making two dollars an hour more than you’re paying me…and I started today.” Gene looked him in the eye and said, “So, you took it and started today without even letting me know! I can’t believe you would do that. You knew I was depending on you.” And the rut just keeps getting deeper and deeper.

Other Episodes